JEPCO was approached to perform the OSBL portion of the conversion at a Rocky Mountain Region refinery. We developed FEL 1,2,3, and detail engineering for the OSBL areas supporting the processing soy oil. Provided design that included feedstock and finished fuel systems, as well as all utilities and firewater systems. This work included all aspects of engineering, multidiscipline from process, piping/mechanical, C/S, E&I. This required a considerable effort to route and utilize existing refinery equipment.