JEPCO served as the EPC firm for the design and construction of a new feed pretreatment unit at CVR Energy’s Wynnewood Refinery.
The unit is capable of producing 7,500 barrels per day of treated feedstock for the Renewable Diesel Unit from vegetable oils and other renewable feeds.
JEPCO provided the following services on this project:
Engineering – 3D model, civil, structural, mechanical, piping and stress analysis, electrical, controls and instrumentation services
Procurement & Construction Management – Safe execution of project activities, i.e., safety oversight, daily activity coordination, procurement expediting, quality assurance, critical lifts, project testing, start-up and commissioning
PROJECT HIGHLIGHTS
• Modular project design
• Feed storage tank
• Pipe racks
• Cooling tower
• Underground piping
• Utility building
• Storm water lift station
• Underground utilities & drains
• Site grading / paving & drainage